STORK TECHNICAL SERVICES



Trademark Coverage

No Class Specified

Design and development of industrial installations; technical feasibility studies; engineering, chemistry, physics and geology services, including consultancy; chemical laboratory services; chemical analyses; drawing up of expert reports by engineers or laboratory technicians; technical research in the field of welding, physics and energy; building research; architectural consultancy; inspections of seals and valves; scientific and technical research in the field of acoustics; scientific and technical research into the condition of materials; product endurance testing; endoscopic and optical research, except endoscopic and optical research for medical purposes; material testing, including stress tests, tear-resistancy tests, remaining life expectancy determination and vibration testing; physics research; leakage testing; testing of machines and tools; determining the properties of materials; research of the structural integrity of industrial installations; fatigue research of products and materials; testing of products in falls; ultrasound testing; metals testing; technical investigation of damage, including building damage; mechanical research and research into metals; microscopic research; salt spray testing; determining asbestos levels; automation services, namely, consulting services in the field of automation of technical installations; computer programming; technical calculations; technical analysis of industrial installations; testing of concrete; technical advice concerning computer security measures; building inspections for the existence of damage, deterioration, decay or mold; building consultancy for the prevention of building damage; building research, namely, research on building construction or city planning; technical advice regarding compliance with the legal requirements for obtaining building permissions; designing industrial installations; designing moulds and stamps; technical advice regarding industrial measures for environmental protection; cement testing; civil engineering inspections; calculating specifications for vehicles, cranes, hoisting cranes and elevating installations; designing and developing shock and vibration proof constructions; corrosion testing; ferrite measuring; hardness measuring; noise testing; studying of production processes in order to achieve technical optimization; hydraulic designing, calculations and simulations; disturbance analyses; drawing up environmental impact reports; oil and gas prospecting; analysis for oil field and gas field exploitation; checking gas and oil sources; design and development of telecommunications installations, including telephone kiosks, telephone masts and internet masts

Owner
Timeline
  • Dec 03
    2013
    Registered Principal Register
  • Sep 17
    2013
    Official Gazette Publication Confirmation E Mailed
  • Sep 17
    2013
    Published For Opposition
  • Aug 28
    2013
    Notification Of Notice Of Publication E Mailed
  • Aug 09
    2013
    Law Office Publication Review Completed
  • Aug 03
    2013
    Approved For PUB Principal Register
  • Aug 02
    2013
    TEAS/Email Correspondence Entered
  • Aug 02
    2013
    Correspondence Received In Law Office
  • Aug 02
    2013
    TEAS Response To Office Action Received
  • Jul 30
    2013
    Notification Of Non Final Action E Mailed
  • Jul 30
    2013
    Non Final Action E Mailed
  • Jul 30
    2013
    Non Final Action Written
  • Jul 08
    2013
    Previous Allowance Count Withdrawn
  • Jun 24
    2013
    Withdrawn From PUB OG Review Query
  • Jun 07
    2013
    Law Office Publication Review Completed
  • Jun 07
    2013
    Assigned To LIE
  • Jun 06
    2013
    Approved For PUB Principal Register
  • Jun 06
    2013
    Examiner's Amendment Entered
  • Jun 06
    2013
    Notification Of Examiners Amendment E Mailed
  • Jun 06
    2013
    Examiners Amendment E Mailed
  • Jun 06
    2013
    Examiners Amendment Written
  • Dec 06
    2012
    Notification Of Final Refusal Emailed
  • Dec 06
    2012
    Final Refusal E Mailed
  • Dec 06
    2012
    Final Refusal Written
  • Oct 31
    2012
    TEAS/Email Correspondence Entered
  • Oct 31
    2012
    Correspondence Received In Law Office
  • Oct 31
    2012
    Applicant/Correspondence Changes (Non Responsive) Entered
  • Oct 23
    2012
    Assigned To LIE
  • Oct 10
    2012
    TEAS Voluntary Amendment Received
  • Oct 09
    2012
    TEAS Change Of Correspondence Received
  • Oct 09
    2012
    TEAS Response To Office Action Received
  • Apr 09
    2012
    Non Final Action Mailed
  • Apr 09
    2012
    Non Final Action Written
  • Mar 16
    2012
    Assigned To Examiner
  • Dec 13
    2011
    Notice Of Design Search Code Mailed
  • Dec 12
    2011
    New Application Office Supplied Data Entered In TRAM
  • Dec 09
    2011
    New Application Entered In TRAM